Bespoke Masterpieces Since 1985
Engineered Bridge Solutions Backed by 40 Years of Proven Performance
Spec Sheets For Download
Vehicle Repetitive Span Bridge
Download the Vehicle Repetitive Span Bridge cut sheet to review a conceptual elevation view, typical span layout, loading information, and example project imagery for vehicular timber bridge applications.
Vehicle Free Span Bridge
Download the Vehicle Free Span Bridge cut sheet to explore a conceptual free-span vehicular bridge layout designed for crossings where longer clear spans or reduced in-water supports may be needed.
Vehicle Multi-Span Bridge
Download the Vehicle Multi-Span Bridge cut sheet to review a conceptual layout for vehicular bridge projects requiring multiple spans across waterways, easements, channels, or varied site conditions.
Pedestrian Repetitive Span Bridge
Download the Pedestrian Repetitive Span Bridge cut sheet to view a conceptual timber bridge elevation for trail, park, campus, community, and pedestrian access applications.
Pedestrian Free Span Bridge
Download the Pedestrian Free Span Bridge cut sheet to explore a conceptual bridge layout for pedestrian crossings where a clear span is preferred.
Pedestrian Multi-Span Bridge
Download the Pedestrian Multi-Span Bridge cut sheet to review a conceptual timber bridge layout for longer pedestrian crossings.
Pedestrian, Vehicular, Golf Cart, and Trail Bridge Systems Designed To Meet Demanding Site Conditions.
York Bridge Concepts works alongside engineering firms to deliver code-compliant bridge solutions for public and private projects nationwide.
Our bridges are engineered to satisfy load requirements while minimizing environmental impact and accelerating project delivery.
Key Engineering Challenges We Solve
Difficult Site Conditions
Wetlands
Floodplains
Water Crossings
Steep Grades
Environmental Constraints
Minimal Site Disturbance
Top-Down Construction
Reduced Impact Footprint
Load Requirements
Pedestrian
Golf Cart
Maintenance Vehicles
HS20-44
HL-93
Custom Loads
Engineering Resources
Design Loads
85-100 PSF Pedestrian
HS20-44 Vehicular
HL-93 Available
Construction Methodology
Top-Down Construction
Reduces:
- Wetland impacts
- Access road requirements
- Site disturbance

Thousand Trails
320' vehicular bridge replacing failed culvert

Hampton Lake
Navigable creek crossing

Trump Doral National Golf Course
Hybrid Cart Bridge overpass



